Divisions 21 to 28, MEP

MEP Estimating Services for Mechanical, Electrical, Plumbing & Fire Protection

On most commercial buildings, mechanical, electrical, plumbing, and fire protection together are among the largest cost packages on the job, and the hardest for a general contractor to check. Each discipline has its own drawings, its own specifications, and its own subcontractor. The equipment that ties them together appears on all of them and belongs, clearly, to none.

Our MEP estimating services price all four disciplines as one coordinated package, so the connections between them are counted once and the scope split is clear.

Pipes and ducts running through a building ceiling
24 to 48 hoursTypical turnaround
Divisions 21 to 28Coordinated across trades
Excel + PDFWith marked-up drawings
ZIP-code pricedLocal material and labor rates
24 to 48 hoursTypical turnaround

What's Included in an MEP Estimate

Electrical: Division 26

Service and distribution, feeders, branch circuits, lighting, devices, and grounding. Electrical estimating →

Communications and low voltage: Divisions 27 and 28

Structured cabling, fire alarm, security, and access control. Telecom estimating →

Fire protection: Division 21

Sprinkler mains, branch lines, heads, valves, standpipes, and fire pumps.

Where MEP Scope Falls Through the Cracks

Most MEP gaps happen where one discipline hands off to another. These are the items we check on every MEP estimate:

ItemTypical question
Power to HVAC equipmentDisconnects, starters, and VFDs: furnished by mechanical, installed by electrical?
Controls wiringIn the controls contractor's scope or the electrician's?
Condensate drainsMechanical or plumbing?
Gas piping to equipmentPlumbing to the equipment, or mechanical?
Water heater ventingPlumbing or mechanical?
Fire alarm interfacesDuct detectors, damper interlocks, and flow switches: who wires them?
Kitchen equipment connectionsOwner-furnished equipment connected by plumbing and electrical?
Firestopping at penetrationsEach MEP trade, or a single firestop contractor? Fireproofing estimating →
Housekeeping pads and equipment supportsConcrete sub, structural steel, or mechanical?
Roof penetrations and curbsRoofing, mechanical, or GC?

We price each item once, in the scope where the specifications place it, and list any that the documents leave unclear.

Controls and Building Automation

Building automation systems are often specified under Division 23 but installed by a separate controls contractor. The scope includes controllers, sensors, valves and actuators, wiring, programming, and commissioning support. Because it crosses mechanical and electrical, it's one of the easier scopes to miss entirely. We list controls as its own section so it's visible.

For GCs: Checking MEP Subcontractor Bids

MEP bids are hard to compare. Each sub qualifies its number differently, excludes different items, and carries different assumptions about equipment. An independent MEP estimate lets you:

  • See whether a low bid is missing scope
  • Compare subs on the same scope basis
  • Identify equipment that one sub included and another didn't
  • Negotiate from documented quantities

Who Uses MEP Estimating

  • General contractors pricing and leveling MEP packages
  • Design-build firms carrying MEP in-house
  • MEP contractors self-performing more than one discipline
  • Owners and developers checking MEP budgets Budget estimating →
Checklist

What to Send

  • Mechanical, plumbing, electrical, fire protection, and low-voltage drawings
  • Equipment schedules
  • Divisions 21 to 28 specifications
  • Architectural plans and reflected ceiling plans
  • Addenda

Send Your Files

Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.

Upload Your Plans →

Or email info@primeestimation.com.

Estimator pointing to a schedule on a drawing sheet
Excel + PDFWith marked-up drawings
Deliverables

What You Receive

  • Estimates by discipline with material, labor, and equipment
  • Equipment list with connections by discipline
  • Interface and scope-split matrix
  • Clarifications and exclusions
  • Excel and PDF files
FAQ

Frequently Asked Questions

What does MEP estimating include?

Mechanical (HVAC), electrical, and plumbing systems, and typically fire protection and low-voltage systems: equipment, distribution, devices, labor, and testing.

Can you estimate just one discipline?

Yes. See our mechanical, electrical, and piping pages.

How do you avoid gaps between MEP trades?

By checking every equipment connection and interface against the specifications and listing the scope split in the estimate.

Ready to Get Started?

Price the MEP Package, Including the Connections

Send your MEP drawings and specs. We'll quote the estimate and delivery date.

↑