Gypsum board
by type and thickness (standard, Type X, moisture-resistant, abuse-resistant, shaft liner, and exterior sheathing) in square feet and sheet counts
Drywall bids are won and lost on the details nobody sees once the paint goes on: how tall the walls go, which assemblies are rated, how many layers they need, what level of finish the architect specified, and whether the walls run to the deck or stop above the ceiling.
Our drywall estimating services take off gypsum board, metal stud framing, and finishing for commercial and residential projects, organized by wall type so you can check every assembly against the partition schedule.
by type and thickness (standard, Type X, moisture-resistant, abuse-resistant, shaft liner, and exterior sheathing) in square feet and sheet counts
by size, gauge, spacing, and height
top, bottom, and deflection track
tape, joint compound, corner bead, and trims
control joints, reveals, and access panels
framing, hanging, taping, and finishing
All organized by partition type, so each line ties back to the wall schedule.
Wall height drives framing cost more than anything else:
need deeper or heavier-gauge studs to meet deflection limits, which the partition schedule or a design table specifies.
need deflection (slip) track so the structure can move without cracking the wall.
may stop at the ceiling with bracing to structure, or continue to the deck for fire or acoustic reasons.
need additional framing at doors, windows, and large penetrations.
Structural, load-bearing light-gauge framing is part of our framing or metal estimates. Framing estimating →
Fire-rated partitions follow specific tested designs, which dictate board type, layers, stud size, and fastening. A two-hour wall may have two layers of Type X on each side: four times the board of a single-layer wall.
Shaft walls at stairs, elevators, and mechanical shafts are built from one side with shaft liner panels and specialty studs. They carry their own material and labor rates. Firestopping at rated walls is often excluded by the drywall sub: we flag it. Fireproofing estimating →
Industry finish levels run from Level 0 (no finishing) to Level 5 (a skim coat over the entire surface). The level specified changes finishing labor significantly:
typical above ceilings, in mechanical rooms, or where tile is applied
under heavy texture
standard for most painted walls
for critical lighting, gloss paint, or high-end spaces
We price the finish level the specification calls for in each area. Painting estimating →
drywall sub or insulation sub? Insulation estimating →
for cabinets, grab bars, TVs, and equipment
furnished by MEP, installed by drywall?
primer by drywall or paint sub?
We list these in the clarifications so nothing is assumed.
Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.
Upload Your Plans →Or email info@primeestimation.com.
By measuring each wall type's length and height from the plans and sections, calculating board area per side and layer, then adding framing, finishing materials, and labor.
Yes, non-structural framing is part of the drywall takeoff.
The level specified. Where none is stated, we note our assumption.
Gypsum ceilings yes; acoustical tile ceilings if they're in your scope.
Send your plans, partition schedule, and specs. We'll quote the takeoff and delivery date.