Takeoff Services

Construction Takeoff Services for Contractors, Subcontractors and Suppliers

Every bid starts with the same tedious job: going through the drawings sheet by sheet and turning lines, symbols and schedules into quantities you can price. It is slow, it can't be rushed without risk, and it usually lands on the same few people who are also running jobs.

Prime Estimation's construction takeoff services take that work off your desk. Send us your drawings and specifications, and we return organized material and quantity lists, tied back to marked-up plans, so you can get supplier pricing, check sub quotes and build your number with time to spare before the bid date.

We work with general contractors, trade contractors, builders, material suppliers and developers on residential, commercial and industrial projects across the United States.

We review the drawings and send the price and turnaround before any work begins.

Construction team going through a drawing set on a site table
Marked-up plansEvery quantity traceable
Every CSI divisionSingle trade or full project
Net + order qtyWaste shown, never buried
Your templateCost codes, phases or floors
24 to 48 hoursTypical turnaround
The Basics

What a Construction Takeoff Covers, and Where the Estimate Begins

A takeoff answers “how much”

The measured list of everything that has to be bought and installed to build what is shown on the drawings: cubic yards of concrete, linear feet of footing, square feet of drywall, counts of doors, fixtures, devices and fittings, tons of steel.

An estimate answers “how much will it cost”

It takes those quantities and applies material prices, labor hours and rates, equipment, subcontractor pricing, general conditions, overhead and profit.

The distinction matters when you order the service:

  • If you price your own work, a quantity takeoff is usually what you need. You keep control of your unit costs and margins, and we handle the measuring.
  • If you want a number ready to review, a takeoff with pricing adds material and labor costs to the quantities. You can still adjust rates and markup before you submit. See our construction estimating services.

Getting the takeoff right is the part that does the most damage when it goes wrong. A wrong unit price is usually visible on review; a wall type that was never counted is not.

Deliverables

What You Get With Every Takeoff

You receive files you can work from directly, not just a total.

Excel quantity sheets

Each line item with a description, unit of measure, quantity, and the drawing sheet it came from. Organized by CSI MasterFormat division by default, or by your cost codes, phases, floors or areas if you prefer.

Color-coded marked-up plans (PDF)

Every measured area, run and count highlighted on the drawings, so anyone in your office can see what was included and where.

Assumptions, inclusions and exclusions

Written notes on how we interpreted unclear details, which items we counted, and what we deliberately left out, for example, items shown as “by owner” or “NIC”.

Summary sheet

Totals by trade or division, for a quick read before you get into the detail.

Pricing, if ordered

Material, labor and equipment costs added to the quantities, drawn from RSMeans, Craftsman and our own regional databases and adjusted to your project's ZIP code.

Your own spreadsheet layout

Send us your template and we'll fill it in, so the numbers drop straight into your estimating workflow.

See a sample estimate →

Example of how line items are laid out

Illustrative format only, not from a client project.

CSIItemUnitNet qtyWasteOrder qtySheet ref
03 30 00Slab on grade, 4" thick (3,450 SF)CY42.65%44.7S-101
03 20 00#4 rebar, continuous footing, 2 barsLF1,18010% laps & waste1,298S-201
09 21 165/8" Type X gypsum board, wall type W3, both sidesSF12,80010%14,080 (294 sheets, 4×12)A-501
08 14 16Flush wood door, 3'-0" × 7'-0", per door scheduleEA4646A-601

Showing net and order quantities separately lets you see (and change) the waste allowance instead of trusting a figure that has it buried inside.

Takeoff Options

Order the Takeoff That Fits the Job

Quantities only, a single trade, a whole building, or quantities with pricing: each built to the same standard.

Material takeoffs

A list of the materials to purchase, with sizes, types and order quantities. Useful for subcontractors placing orders and for suppliers quoting a package. Material takeoff services →

Quantity takeoffs

Measured quantities of work by scope (areas, volumes, lengths and counts) organized for pricing. This is the standard input for a bid estimate. Quantity takeoff services →

Single-trade or full-project

Subcontractors typically need one scope measured in depth: just the drywall and framing, just the concrete, just the electrical. General contractors bidding a whole building may want every division measured so they can check sub coverage and find scope gaps between trades. We do both.

Takeoffs with pricing

Quantities plus material, labor and equipment costs, laid out so you can adjust rates, overhead and profit before you submit. This is where takeoff and estimating meet. Bid estimating services →

Preliminary and budget takeoffs

For owners, developers and architects working from schematic or design-development drawings, we measure what the drawings show and note where quantities are based on assumptions, so you can test a budget before the design is finished.

Not sure which to order?

Send the drawings and tell us how you'll use the numbers. We'll recommend the right option in your quote.

Get a Recommendation →
Who We Work With

Who Uses Our Takeoffs

General contractors

Use full-project takeoffs to check that sub bids cover the whole scope, to carry trades they self-perform, and to put a number on scopes where no sub bid comes in.

Subcontractors

Use trade takeoffs to bid more jobs without adding staff, especially in busy months when several bid dates land in the same week.

Material suppliers and vendors

Use material lists to quote contractor packages quickly and accurately.

Home builders and remodelers

Use takeoffs to order materials for a house or addition and to keep repeat plans consistent.

Developers, architects and lenders

Use quantity takeoffs and budget numbers to test feasibility, compare against contractor pricing, or review a draw request.

Bid date coming up?

Send the set with your bid date and we'll tell you up front whether we can deliver with time to review.

Upload your plans →
Process

How Our Construction Takeoff Process Works

Quote first, measure second, and delivered with room to review before your bid.

Send Your Documents →
  1. 01

    Send Your Documents

    Upload drawings, specifications and addenda through the quote form, email them, or share a Google Drive folder or plan room link for large sets. Tell us the scope you need measured and your bid date.

  2. 02

    Get a Quote First

    We review the set and send you a price and turnaround time. Nothing is started until you approve it.

  3. 03

    We Measure and Build It

    Our estimators work digitally on the drawings in PlanSwift, Bluebeam Revu and On-Screen Takeoff, marking everything they measure. Unclear details (site conditions, prevailing wage requirements, phasing) are noted as assumptions or sent to you as questions rather than guessed.

  4. 04

    Review Before Delivery

    A second estimator checks the quantities against the drawings and specifications for missed items and unit errors before anything is sent to you.

  5. 05

    Files With Room to Spare

    We aim to deliver early enough for you to review and collect supplier and sub pricing, where possible, at least two days before your bid date. After your review we can make revisions, add supplier quotes you've received, and help you finalize pricing.

Checklist

What to Send for an Accurate Takeoff

The more complete the set, the fewer assumptions we have to make. If you can, include:

  • The full drawing set: architectural, structural, civil, MEP, not just the sheets for your trade (schedules and details are often elsewhere)
  • Project specifications, or at least the sections for your scope
  • All addenda issued so far
  • The bid invitation, bid form, or scope letter describing what you're responsible for
  • Your preferred format or template, cost codes, and how you want items grouped
  • Any known alternates, phasing, or areas excluded from your scope
  • For priced takeoffs: project location, and whether you want us to use your material or labor rates

File Types We Work From

PDF drawings are fine. If you have CAD files or a plan room link, send those too. Large sets travel best as a shared folder link.

Upload Your Plans →

Or email them to info@primeestimation.com.

Estimator pointing to a schedule on a civil drawing sheet
Quality

What Makes a Takeoff Usable on Bid Day

Two takeoffs of the same drawings can come out with different totals and both look tidy. The useful one is the one you can trust and defend. These are the details we pay attention to:

  • Scope boundaries. Most money on a bid is lost in gaps and overlaps between trades: blocking that neither framing nor drywall picked up, sleeves that fall between plumbing and concrete, equipment pads drawn on the mechanical sheets but not the structural. We note where the line between scopes sits so you're not caught by it later.
  • Specifications, not just drawings. A wall type on the plan might say “W3”, but the spec can call for a different board, an extra layer, or a moisture-resistant product in certain rooms. The takeoff should follow both.
  • Addenda. A late addendum can change a slab thickness, a door schedule or a fixture count. We take off against the latest documents you send and can update the takeoff when another addendum is issued.
  • Waste and units. Concrete, drywall, rebar laps, tile and lumber all carry different waste allowances, and materials are bought in units that don't match the drawn quantity: sheets, sticks, rolls, boxes. We show net and order quantities separately so the allowance is visible.
  • Written assumptions. If a detail is unclear, the takeoff says so. An assumption you can see is something you can correct; a silent guess isn't.
Your Review

How to Check an Outsourced Takeoff

You should never have to accept quantities on faith. A quick review that takes 20 to 30 minutes:

  1. 1

    Open the markups next to the spreadsheet

    Pick three or four line items and find them on the drawings. Every item should be traceable to a sheet.

  2. 2

    Look for unmarked areas

    On the marked-up PDF, anything in your scope that isn't highlighted wasn't counted.

  3. 3

    Run one rough check per major item

    Slab area × thickness ÷ 27 for cubic yards; wall length × height for board area. If the takeoff is far off a rough check, ask why.

  4. 4

    Read the exclusions and assumptions

    Make sure nothing you're responsible for is listed as excluded.

  5. 5

    Confirm the addenda

    Check that the latest addendum number is noted.

If something doesn't line up, send us the question. That's what the review step is for.

Comparison

Outsourcing Takeoffs vs Doing Them In-House

Both approaches work. The right one depends on how many bids you run and how evenly they come in.

 In-house estimatorOutsourced takeoff services
Cost structureFixed salary and benefits whether or not you're biddingPaid per project, so the cost follows your bid volume
SoftwareYou buy and maintain takeoff software licensesIncluded in the service
Busy periodsLimited to one person's hours; something gets skipped when bids stack upSend more projects when more bids come in
Knowledge of your pricingStrong: they know your crews and historyYou keep your own unit costs; we provide the quantities
Best forSteady, high bid volume in a narrow scopeVariable bid volume, extra capacity, unfamiliar trades or large sets

Many contractors use both: their own estimator prices the work, and an outside team handles the measuring on busy weeks or on scopes outside their usual work. See our freelance construction estimating services.

Pricing and Turnaround

Flat Per-Project Pricing, Quoted Before You Commit

We price takeoffs per project rather than hourly, and quote each job after reviewing the drawings. You see the price and the delivery time before you commit.

Single-trade takeoff

Often within 24 hours

One scope measured in depth: drywall, concrete, electrical, lumber.

Typical fee $250 to $600

Multi-trade takeoff

24 to 48 hours

Several divisions taken off to the same assumptions, so nothing is double-counted.

Quoted per project

Full-project package

Confirmed in your quote

Every division on a large or dense set, with a delivery date agreed up front.

Quoted per project

Monthly retainer

Priority queue

A set volume of takeoffs each month with the same dedicated estimator.

From $1,500/mo

What affects the price and timing:

  • Number of trades or divisions: one trade versus a full building
  • Project size and number of sheets
  • Drawing quality and complexity: clear, dimensioned plans move faster than incomplete or hand-marked sets
  • Level of detail: quantities only, or quantities with material and labor pricing
  • Required format: our template or yours
  • Deadline: how soon you need it relative to the bid date
Get a Takeoff Quote →
Two estimators in hard hats reviewing a drawing set
Why Prime Estimation

Why Contractors Send Their Plans to Prime Estimation

We provide construction takeoff services for projects anywhere in the U.S. Because the work is done digitally from your drawings, location doesn't limit what we can measure, and when a takeoff includes pricing, we apply material and labor costs for the project's ZIP code rather than a national average.

Quote first, work second

A price and turnaround after we've looked at your actual drawings: no surprises on the invoice.

Traceable quantities

Every line item ties back to a marked-up drawing, so your team can check it.

Your format, your codes

Delivered in your template and grouped the way you price.

Across trades

From earthwork to finishes to MEP, one team can measure a single scope or the whole building.

Experience across project types

More than 1,500 projects priced across federal, institutional, commercial, industrial and residential work.

Support after delivery

Questions, revisions and addenda updates are handled by the team that did the work.

FAQ

Frequently Asked Questions

What contractors ask before outsourcing their first takeoff.

What are construction takeoff services?

Construction takeoff services are outsourced measuring and counting of the materials and work shown on construction drawings. An estimator reviews the plans and specifications and produces quantity lists (volumes, areas, lengths and counts) that contractors use to price bids and order materials.

What's the difference between a takeoff and a cost estimate?

A takeoff gives you quantities. An estimate turns those quantities into a cost by adding material prices, labor, equipment, overhead and profit. You can order quantities only, or a takeoff with pricing.

How much do construction takeoff services cost?

It depends on the number of trades, the size of the drawing set, its complexity and the level of detail. Single-trade takeoffs typically run $250 to $600. We quote each project on a flat per-project basis after reviewing the drawings, so you know the price before work begins.

How long does a takeoff take?

Most takeoffs are delivered within 24 to 48 hours, and single-trade takeoffs are often back within 24 hours. Large sets take longer. You get a delivery time with your quote, and we aim to finish early enough for you to review the takeoff before your bid date.

What file formats will I receive?

Excel spreadsheets with the quantities and line-item detail, plus color-coded PDF drawings showing what was measured. We can also fill in your own estimating template.

Can you do a takeoff for just one trade?

Yes. Subcontractors and suppliers often order a single scope (drywall, concrete, electrical, lumber) and general contractors often order full-project takeoffs.

What if an addendum is issued after I receive the takeoff?

Send it to us and we'll update the affected quantities on the same takeoff, so you're not re-checking the whole set yourself.

Can you work from incomplete or preliminary drawings?

Yes. We measure what's shown and document the assumptions where information is missing, so you can see which numbers are firm and which are placeholders.

Do you include waste in the quantities?

Yes, and we show it separately. Net quantities and order quantities are both listed, so you can adjust the waste allowance to suit your crews and suppliers.

Ready to Get Started?

Get a Quote on Your Next Takeoff

Have a bid coming up? Send us the drawings, specs and addenda along with your bid date. We'll review the set and come back with a price and turnaround time, then you decide.

↑