Sydney & New South Wales
High-density residential, mixed-use and infrastructure-linked development across Greater Sydney and regional centres.
Metric takeoffs for Australian tenders, with NCC, bushfire and cyclone scope picked up.
Australian projects are measured in metric, tendered against quantities, and built to the National Construction Code, with bushfire attack levels, cyclonic wind regions and energy ratings changing the scope from one site to the next. State-based licensing and levies add another layer to the price.
Prime Estimation prepares quantity takeoffs and construction estimates for Australian builders, trade contractors and developers. Quantities are delivered in metric, organised the way your tender is structured, and typically turned around in 24 to 48 hours from digital drawings: often overnight given the time difference.
Housing targets, infrastructure pipelines and major events keep Australian builders stretched, and each state brings its own planning system, licensing body and climate risks.
High-density residential, mixed-use and infrastructure-linked development across Greater Sydney and regional centres.
Apartments, townhouses and new growth-area estates, plus commercial and institutional work.
Residential growth and the venue and infrastructure pipeline ahead of the 2032 Olympic and Paralympic Games.
Residential and commercial work alongside resources-sector support facilities, with remote-site logistics.
Defence-related construction, health and education projects, and steady residential growth.
Darwin, Far North Queensland and regional towns, where cyclonic wind design and distance drive the cost.
The Australian conditions we look for on every set and carry into the quantities.
Sites in bushfire-prone areas carry a BAL rating under AS 3959 that dictates cladding, glazing, decking, vents and ember protection. Higher ratings mean noticeably more expensive materials.
Northern Australia's cyclonic regions require stronger tie-downs, bracing, roof fixings and debris-resistant openings: all taken off from the structural drawings.
NCC energy requirements, including higher NatHERS star ratings for new homes, increase insulation, glazing performance and sealing. Envelope materials are priced as specified.
Reactive clay site classifications drive stiffened rafts and deeper footings, and termite management systems are required in many areas. Each is carried as its own item.
Long service leave levies, home warranty or building insurance and state licensing requirements vary between states and add to project costs.
Regional and remote projects carry freight, accommodation, travel and extended mobilisation that a capital-city rate never includes.
How Australian requirements show up in the takeoffs and estimates we deliver.
| Requirement | What it means | How we handle it |
|---|---|---|
| National Construction Code | The NCC sets performance requirements for buildings nationwide, adopted by each state and territory with local variations. | Takeoff follows the NCC edition and state variations on the drawings. |
| Bushfire construction, AS 3959 | Sites in bushfire-prone land are assessed for a Bushfire Attack Level that sets construction requirements. | BAL-specific materials priced for the rating shown. |
| Wind loading: AS/NZS 1170.2 | Wind regions, including cyclonic regions in the north, determine structural and fixing requirements. | Tie-downs, bracing and fixings taken off for the region shown. |
| Units and format | Australian tenders use metric quantities, often presented as a bill of quantities by trade or element. | Metric quantities in your trade breakdown or tender format. |
| GST and pricing basis | GST applies at 10%; material and labour rates vary by state and city. | GST shown separately; priced with your rates, or quantities only. |
Full project estimates or a single trade: every one priced to the project's location and checked by a second estimator.
Complete estimates and quantity takeoffs for Australia projects.
One division measured in depth, in the units your trade bids in.
Everything happens from your digital drawings, so distance never slows the job down.
Upload the drawings, specs and addenda, and give us the project address or ZIP code and your bid date.
We review the set and reply (usually within a few hours) with a fixed fee and a delivery date. Nothing starts until you approve.
Quantities are measured digitally, priced to Australia material and labor conditions, and audited by a second estimator.
Excel and PDF with marked-up drawings and a written assumptions page, typically in 24 to 48 hours. Addenda are worked into the same file.
Yes. Quantities are measured in metric and can be organised by trade, by element or in your own tender template.
Yes. We take off the cladding, glazing, decking, vents and ember protection required for the Bushfire Attack Level shown on the drawings.
Yes. For projects in northern cyclonic regions we take off the tie-downs, bracing, roof fixings and openings required by the structural design.
It usually helps. Plans sent at the end of your working day can be worked on overnight, so many takeoffs are ready the next morning. Standard turnaround is 24 to 48 hours, confirmed in your quote.
We show GST separately at 10% or exclude it, depending on how you prefer to present your tender.
Send your drawings and the project location. You'll get a fixed fee and a delivery date back, usually within a few hours.
We estimate projects in all 50 states. These are the areas with their own pages; see all service areas.