Ductwork
- Rectangular duct
- Round and spiral duct
- Flat oval duct
- Flexible duct and connectors
- Exhaust, return, outside air, and supply systems
- Kitchen grease and specialty exhaust duct
Sheet metal is priced by the pound, and labor is driven by the fittings. A ductwork takeoff that only gives you linear feet of duct leaves out most of what you need to bid the job.
Our duct takeoff services measure ductwork the way sheet metal contractors actually price it: duct weight by gauge, fittings by type and size, accessories, air devices, insulation, and hangers: organized by system so you can check every run against the drawings.
Elbows, offsets, transitions, tees, wyes, taps and takeoffs, end caps, and reducers: counted by type and size.
Supply diffusers, return and exhaust grilles, registers, and louvers: by type, size, and count, matched to the air device schedule.
External duct wrap and internal duct liner by area, with thickness and type from the specifications. Insulation estimating →
Hangers, trapeze supports, and seismic bracing where the drawings or specs call for it.
Rectangular duct gauge depends on duct size, static pressure class, and reinforcement: following the duct construction standards (typically SMACNA) referenced in the specifications. A 24-inch duct at low pressure and the same size at higher pressure may be different gauges with different reinforcement.
Our takeoff reports:
, so you can price material by the pound
of duct, used for insulation and liner
, for round and spiral duct priced per foot
by system, as identified in the specs and drawings
galvanized, stainless, aluminum, or black iron where specified
A straight run of duct goes up quickly. Fittings take far more labor to fabricate and install. Two systems with the same footage can carry very different labor if one has many elbows, transitions, and branch takeoffs.
That's why we count fittings separately by type and size. Whether you price labor with fitting equivalents, labor units per piece, or your own production rates, you have the counts you need.
Quantities to price the job: weight by gauge, fittings, accessories, air devices, and insulation. This is what most contractors need before bid day.
Piece-by-piece quantities closer to what the shop will build. This requires coordinated drawings and usually comes after award.
Tell us which one you need when you send the job.
Every takeoff is broken down so it's easy to check and to split into crews or phases:
Marked-up drawings are color-coded so you can see which runs were counted.
bidding commercial and industrial ductwork
pricing the air side of a mechanical bid Mechanical estimating →
quoting fabricated duct packages
checking HVAC subcontractor bids MEP estimating →
Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.
Upload Your Plans →Or email info@primeestimation.com.
Send the mechanical drawings and specifications
Get a quote and delivery date
Approve, and we complete the takeoff, with questions if scope splits are unclear
Review, and send addenda for updates before bid day
A duct takeoff is a measured list of all ductwork, fittings, accessories, air devices, insulation, and supports on an HVAC project. Sheet metal and mechanical contractors use it to price material and labor.
Yes. Rectangular duct is reported by gauge and weight based on size and pressure class from the specifications.
Yes, counted by type and size against the schedules on the drawings.
We can add material and labor pricing for the project's location, or deliver quantities only for your own pricing. Single-trade takeoffs typically run $250 to $600.
Residential systems are typically simpler (mostly flex and round duct) and we can price them as well.
Send your mechanical set. We'll quote the takeoff and confirm the delivery date.