AACE Estimate Classes Explained for Contractors
What Class 1 through Class 5 actually mean, which one your drawings support, and how to budget against the range instead of a single number.
Read the short version →Practical notes on takeoffs, pricing and bidding, written by working estimators.
No filler and no generic “10 tips” lists. Each article tackles one thing that costs contractors money on bids: how to measure it, how to price it, and how to write it down so it holds up later.
Our first articles are being written now. Subscribe below and we'll send each one when it's published.
What Class 1 through Class 5 actually mean, which one your drawings support, and how to budget against the range instead of a single number.
Read the short version →Why measuring formwork as wall square footage is one of the most common ways vertical concrete gets underbid.
Related: concrete estimating →Reading a wage determination, classifying workers correctly, and carrying fringe benefits without double-counting.
Related: local pricing factors →The page that turns a number into a document you can defend in a scope review, and the clarifications every bid should carry.
Related: what we deliver →Salary is only the start. Software, cost data, review and bid-season capacity all belong in the comparison.
Related: the comparison table →The drawings, specs, addenda and bid forms that get you a faster quote and a tighter estimate.
Related: what to send →An occasional email when something worth reading goes up. No spam, unsubscribe anytime.
The five AACE classes, the accuracy range for each, and what drawings you need to reach them.
Drawing count, divisions, document quality and turnaround, and how to keep each one down.
The MasterFormat divisions most trade work falls into, and what's typically taken off in each.