Paint is the cheap part of a painting job. Labor is most of the cost, and labor depends on things a square-foot number doesn't show: how much cutting in there is, how high the walls go, how many colors change room to room, and how many doors, frames, and railings need brushing by hand.
Our painting estimating services take off every paintable surface and counted item from the drawings and finish schedule, then price material and labor based on the paint system specified.
Measured by area
Measured by length
Counted
Production rates (how many square feet or items a painter completes per hour) change with:
anything above reach needs ladders, scaffolds, or lifts
small rooms with lots of corners and edges are slower than open walls
accent walls and multiple colors per room add cut lines
block and textured surfaces take more material and time
brush, roll, or spray
after-hours work, protection, and limited access
We apply production rates by surface and condition, or use your own rates if you provide them.
Specifications define a paint system for each substrate, for example, one coat of primer and two finish coats on new gypsum board, or a block filler plus two coats on concrete masonry. We read the paint schedule and price the right number of coats and products for each surface rather than applying a generic "two coats."
, often painted with dryfall coatings
and doors that arrive primed but need finish paint
pipes, ducts, and conduit in exposed areas
listed in a corner of the finish schedule
, if in scope
Siding, trim, soffits, fascia, stucco, masonry, metal panels, and railings, with surface prep (pressure washing, scraping, caulking), primer requirements, and access equipment for upper stories.
Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.
Upload Your Plans →Or email info@primeestimation.com.
Measure paintable surfaces by area and length, count doors, frames, and other items, apply the specified paint system and coats, then price labor using production rates adjusted for height and complexity.
Yes, counted and priced individually.
Yes, including prep and access equipment.
Yes, if you provide them.
Send your plans and finish schedule. We'll quote the takeoff and delivery date.