Preliminary Estimating

Preliminary Estimating Services for Early Design Decisions

The cheapest time to change a building is before it's drawn in detail. Moving a wall, simplifying the roof, or switching the structural system costs almost nothing during schematic design, and a great deal after construction documents are finished.

A preliminary estimate puts a cost on the design while those choices are still open. We price concept sketches, schematic plans, and early design development drawings so owners and design teams can see what the design costs now, what's driving it, and where the alternatives sit.

Hands on a residential floor plan drawing
24 to 48 hoursTypical turnaround
Early designSchematic and DD drawings
Excel + PDFWith marked-up drawings
ZIP-code pricedLocal material and labor rates
24 to 48 hoursTypical turnaround

When a Preliminary Estimate Makes Sense

  • You have a concept or schematic design and need to know whether it fits the budget
  • You're choosing between two or three design options
  • The owner wants a cost check before approving the next design phase
  • A design-build team needs a number for a proposal before full drawings exist
  • A project has grown in scope and you need to know by how much

If you need a full bid-ready number, you'll want a detailed estimate from construction documents instead. Building estimating →

Matching the Estimate to the Design Stage

A preliminary estimate uses the information that exists and doesn't pretend to more precision than the drawings allow.

Concept or Program Stage

What exists: building use, approximate size, number of floors, site. How we price it: cost per square foot or per unit (per bed, per apartment, per parking space), adjusted for location, quality level, and building type, then split into major systems. This is a rough order of magnitude (ROM) estimate.

Schematic Design

What exists: floor plans, basic elevations, an outline of the structural and MEP approach. How we price it: assemblies (priced square feet of each wall type, roof type, floor system, and MEP system) measured from the plans. Interior finishes and details are carried as allowances.

Design Development

What exists: most systems are defined; details and specs are in progress. How we price it: quantity takeoffs for most major elements, with allowances only for the parts that aren't drawn yet.

How Accurate Is a Preliminary Estimate?

Accuracy follows design maturity. AACE International's estimate classification system is a common way to describe this: a Class 5 estimate is based on very limited project definition and carries a wide range; a Class 3 estimate, built on substantially developed design, is much tighter. Most preliminary estimates fall between Class 5 and Class 3.

What matters for you is that the estimate states its range and its assumptions. A preliminary estimate that presents a single precise-looking number without either is less useful than it appears.

What Drives Cost Early in Design

A square-foot cost from a database treats every building of the same type as identical. They aren't. These design decisions move the cost long before details are drawn, and a good preliminary estimate accounts for them:

Building shape

A long, narrow building or one with many corners has more exterior wall per square foot of floor than a compact square one. Exterior wall is one of the most expensive systems in a building.

Floor-to-floor height

Extra height adds wall area, column length, stair runs, and duct and pipe risers on every floor.

Structural system and spans

Longer spans need deeper members. Wood, steel, concrete, and masonry each carry different costs and schedules in different markets.

Number of stories

Moving from low-rise to mid-rise can trigger code changes: different construction types, sprinklers, elevators, and fire-rated assemblies.

Site and foundations

Sloped sites, poor soils, and high water tables change the foundation system and earthwork.

MEP intensity

A laboratory, kitchen, or medical space carries far more mechanical and electrical cost per square foot than an office or warehouse.

Glazing percentage

More glass usually means more cost, and can increase mechanical loads.

When we see these factors in your drawings, we price them directly instead of averaging them away.

Comparing Design Options

Much of a preliminary estimate's value comes from comparison. We can price alternatives side by side, for example:

  • Wood frame versus steel frame
  • Brick veneer versus fiber cement versus metal panel
  • Slab-on-grade versus crawlspace
  • Rooftop units versus a central plant
  • Three stories versus four on a smaller footprint

Each option shows its cost difference and what else it affects (structure, schedule, or another trade) so the comparison is fair. Estimating consultant →

Reading Allowances

An allowance is a set amount carried for something that isn't designed yet: say, interior finishes, specialty equipment, or site lighting. Allowances aren't padding; they're placeholders. In our preliminary estimates each one is labeled, so as the design catches up, you know which numbers to replace with real takeoffs.

Who We Work With

Architects and designers

checking a design against the owner's target cost

Design-build contractors

pricing proposals from early documents

Homeowners and custom builders

testing a house design before paying for full drawings

Checklist

What to Send

  • Whatever drawings exist: sketches, plans, elevations, or a massing model
  • Building program: area, use, number of floors or units
  • Location and site description
  • Intended quality level and key materials, if decided
  • Options you'd like compared

Send Your Files

Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.

Upload Your Plans →

Or email info@primeestimation.com.

Team reviewing a commercial drawing set
Excel + PDFWith marked-up drawings
Deliverables

What You Receive

  • A cost summary by building system, with cost per square foot
  • Line items for the elements we could measure
  • Labeled allowances for elements not yet designed
  • Option comparisons, if requested
  • Assumptions, exclusions, and the expected accuracy range
  • Editable Excel and PDF files
Process

How It Works

  1. 01

    Send your drawings or project description

    Send your drawings or project description

  2. 02

    We confirm the scope, the method suited to your design stage, the fee, and the delivery date

    We confirm the scope, the method suited to your design stage, the fee, and the delivery date

  3. 03

    We prepare the estimate, asking about anything the drawings leave open

    We prepare the estimate, asking about anything the drawings leave open

  4. 04

    You review it with the design team

    When the design advances, we can update it.

FAQ

Frequently Asked Questions

What is a preliminary estimate in construction?

It's a cost estimate prepared before construction documents are complete, used to guide design decisions and confirm the project is on budget. It's less precise than a detailed bid estimate but far more useful at the stage when design changes are cheap.

Is a preliminary estimate the same as a conceptual or ROM estimate?

A conceptual or rough order of magnitude estimate is the earliest form of preliminary estimate, built from program information. Preliminary estimates also include schematic and design development estimates, which use more detailed drawings.

Can you estimate a building without drawings?

Yes, at a conceptual level. With the building's use, size, location, and quality level, we can prepare a ROM estimate. The range will be wide, and we'll say so.

How is this different from a budget estimate?

A preliminary estimate prices the construction of an early design to help choose and refine it. A budget estimate sets the owner's full project budget, including soft costs and contingency, for funding and approval.

Will the preliminary estimate match the bids?

Bids depend on the final design and market conditions at bid time. The best way to keep them close is to update the estimate at each design stage.

Ready to Get Started?

Know What the Design Costs While You Can Still Change It

Send your current drawings and the decisions you're facing. We'll recommend the right level of estimate and quote the fee.

↑