Batt and Roll Insulation
Fiberglass and mineral wool batts for wall cavities, floors, and ceilings, taken off by area and thickness for each cavity depth and stud spacing.
Insulation looks simple on a drawing: a squiggly line in a wall section. In the estimate, it's several materials measured in different units, each with its own labor rate, and each driven by code requirements that may not be on the plans at all.
Our insulation estimating services price building insulation for walls, roofs, floors, and foundations, and mechanical insulation for piping, ductwork, and equipment.
Fiberglass and mineral wool batts for wall cavities, floors, and ceilings, taken off by area and thickness for each cavity depth and stud spacing.
Loose-fill fiberglass or cellulose in attics and dense-pack in walls, priced by coverage at the required depth.
Open-cell and closed-cell spray polyurethane foam, priced by board feet (area multiplied by thickness) because foam is bought and applied by volume.
Polyiso, XPS, EPS, and mineral wool boards on exterior walls, under slabs, and at foundations, with fasteners, tape, and adhesives. Thermal and moisture protection →
Sound attenuation batts in interior partitions and floor-ceiling assemblies: usually installed by the drywall contractor, so we flag the scope split. Drywall estimating →
Roof insulation is included in our roofing estimates as part of the roof assembly. Roofing estimating →
A common estimating mistake is measuring all insulation by area. In practice:
square feet by thickness and width
square feet at a depth, converted to bags using coverage charts
board feet (square feet × inches)
square feet by thickness, counted in sheets
linear feet of pipe by size and thickness, plus fittings, valves, and jacketing
We report each type in the unit you price it in.
Required R-values come from the energy code adopted in the project's jurisdiction and the climate zone, and the drawings don't always state them. Code may also require continuous insulation on exterior walls, which changes the wall assembly and adds material and labor.
When the drawings and specs give R-values, we price them. When they don't, we note the assumption so you can confirm before bidding.
by pipe size, insulation thickness, and system (hot water, chilled water, steam, refrigerant, domestic water)
counted separately, as they take more labor than straight pipe
by area Duct takeoff →
tanks, heat exchangers, and vessels
PVC, aluminum, or stainless jacketing where exposed
Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.
Upload Your Plans →Or email info@primeestimation.com.
By board feet (the area multiplied by the thickness in inches) separately for open-cell and closed-cell.
We price what the drawings specify and flag where R-values are missing so you can confirm with the designer.
Yes: by pipe size, thickness, and system, with fittings and jacketing.
Yes, with a note on whether it belongs to the insulation or drywall contractor.