Northern Virginia
Hyperscale data centers in Loudoun and Prince William counties, federal and defense facilities, and high-density mixed-use near Metro stations.
Data centers, federal work and public projects: priced to Virginia's rules.
Virginia combines one of the world's densest data center markets with a deep pipeline of federal and defense construction, and since 2021 its public projects have carried a state prevailing wage requirement. Getting the labor schedule and the MEP scope right matters more here than almost anywhere.
Prime Estimation prepares construction estimates and quantity takeoffs for Virginia general contractors, subcontractors, developers and builders (from Loudoun County to Hampton Roads) priced to the project's location and wage requirements and typically delivered in 24 to 48 hours.
Northern Virginia's data centers and federal campuses set labor rates for much of the state, while Hampton Roads, Richmond and the Shenandoah Valley each run on their own mix of defense, institutional and residential work.
Hyperscale data centers in Loudoun and Prince William counties, federal and defense facilities, and high-density mixed-use near Metro stations.
State government and institutional work, healthcare, advanced manufacturing and residential growth across the capital region.
Naval and shipyard-related construction, port facilities and coastal residential where flooding shapes site design.
University, research and healthcare projects, plus custom residential in the surrounding counties.
Distribution along I-81, manufacturing, education and residential on hilly, rocky terrain.
Fast-growing residential and commercial development between Washington and Richmond along I-95.
The Virginia-specific conditions we look for on every set and carry into the line items.
Switchgear, generators, UPS systems, busway and cooling plants dominate data center budgets. We take off the electrical and mechanical scope in detail rather than pricing it per square foot.
Public contracts of $250,000 or more with state agencies (and with localities that adopt an ordinance) require prevailing wages based on federal Davis-Bacon rates. Labor is priced to the applicable schedule.
Federal and military projects bring security, anti-terrorism, commissioning and documentation requirements that add scope and general conditions. We price what the specifications call for.
Data center and federal work keep electricians and mechanical trades in high demand around Washington, pushing rates above the rest of the state.
In Hampton Roads, flood elevation, raised utilities and stormwater requirements show up on the civil and structural drawings, and in our quantities.
The Virginia Uniform Statewide Building Code applies across the Commonwealth, so code requirements are consistent from one locality to the next, which keeps our takeoffs predictable.
The requirements that most often change a Virginia number, and how each one shows up in our work.
| Requirement | What it means | How we handle it |
|---|---|---|
| Uniform Statewide Building Code | The USBC, based on the International Codes, applies throughout Virginia and is enforced by localities. | Takeoff follows the USBC edition on the permit drawings. |
| Virginia prevailing wage | Public works contracts of $250,000 or more with state agencies, or localities that adopt it, require prevailing wages set by the Commissioner of Labor and Industry. | Labor priced to the applicable wage rates by trade and locality. |
| Federal work: Davis-Bacon | Federally funded projects use U.S. Department of Labor wage determinations. | The correct county determination applied to each trade. |
| Contractor licensing: DPOR | Contractors hold Class A, B or C licenses through the Board for Contractors, based on contract size and annual volume. | Noted in the assumptions; sub scopes packaged by trade when needed. |
| Stormwater and erosion control | Land disturbance requires stormwater management and erosion and sediment control under state regulations. | Controls, ponds and maintenance priced from the civil drawings. |
Full project estimates or a single trade: every one priced to the project's location and checked by a second estimator.
Complete estimates and quantity takeoffs for Virginia projects.
One division measured in depth, in the units your trade bids in.
Everything happens from your digital drawings, so distance never slows the job down.
Upload the drawings, specs and addenda, and give us the project address or ZIP code and your bid date.
We review the set and reply (usually within a few hours) with a fixed fee and a delivery date. Nothing starts until you approve.
Quantities are measured digitally, priced to Virginia material and labor conditions, and audited by a second estimator.
Excel and PDF with marked-up drawings and a written assumptions page, typically in 24 to 48 hours. Addenda are worked into the same file.
It applies to public works contracts of $250,000 or more with state agencies, and with localities that have adopted a prevailing wage ordinance. Rates are set by the Virginia Commissioner of Labor and Industry based on federal Davis-Bacon rates.
Yes. We take off the full building, with particular attention to electrical distribution, generators, UPS, busway and mechanical cooling: the scopes that carry most of the cost on data center work.
Yes. We price to the specifications, including security and anti-terrorism requirements, commissioning and Davis-Bacon wage determinations for the project county.
No. The Uniform Statewide Building Code applies across Virginia. Localities enforce it and may have their own zoning and site requirements, which we price from the civil drawings.
Most estimates are delivered in 24 to 48 hours, and single-trade takeoffs often within 24 hours. You'll have a fixed fee and delivery date first, usually within a few hours.
Send your drawings and the project address. You'll get a fixed fee and a delivery date back, usually within a few hours.
We estimate projects in all 50 states. These are the areas with their own pages; see all service areas.