Substructure
Excavation, footings, foundation walls, grade beams, slab-on-grade, under-slab vapor barrier, and waterproofing below grade.
When you bid a whole building, nobody hands you a clean scope. The drawings are split across architectural, structural, MEP, and civil sheets, the specs live in another binder, and the addenda keep coming. Somewhere in between, a few items belong to no one, and those are the ones that end up coming out of your margin.
Our building estimating services price the complete building: foundations, structure, envelope, interiors, MEP systems, and site. You get a quantity takeoff and cost estimate for every trade, organized the way you plan to use it, with the gaps between trades already checked.
A building estimate follows the building from the ground up. Here's how we work through a typical project:
Excavation, footings, foundation walls, grade beams, slab-on-grade, under-slab vapor barrier, and waterproofing below grade.
Concrete, steel, wood, or masonry structure: columns, beams, floor and roof decks, shear walls, and the connections that tie them together.
Wall assemblies, cladding, windows and storefront, exterior doors, roofing, flashing, and sealants.
Partitions, ceilings, doors and hardware, millwork, flooring, wall finishes, painting, specialties, and toilet accessories.
Plumbing, HVAC, fire protection, electrical, lighting, low voltage, and conveying systems like elevators.
Built-in equipment such as kitchen equipment, lockers, and window treatments, when included in the contract.
Grading, utilities, paving, curbs, sidewalks, site lighting, and landscaping.
Each section is quantified from your drawings and then priced with material, labor, and equipment costs for your project's location.
Single-trade estimates are rarely wrong about their own trade. Whole-building estimates go wrong at the seams, where one trade ends and another begins. These are the items we check specifically:
Wood blocking for cabinets, grab bars, and wall-hung fixtures often isn't drawn by the carpenter's sheets or carried by the drywall sub.
Copings, counterflashing, and parapet caps can fall between the roofer, the sheet metal sub, and the cladding installer.
Every pipe, duct, and conduit through a rated wall needs it. MEP subs often exclude it; drywall subs may exclude it too.
The mechanical sub sets the rooftop unit, the electrician feeds it, but who provides the curb, the structural support, or the gas line?
Conduit and back boxes for data, security, and AV may be in the electrical scope, the low-voltage scope, or neither.
Appliances, signage, or equipment the owner buys still need installation, power, and sometimes blocking.
When we find an item that isn't clearly assigned, we price it and list it in the clarifications so you can decide where it belongs before bid day.
The trade costs are only part of what it costs to build. A building estimate also needs the general contractor's costs to run the job:
site supervision, project management, temporary facilities, utilities, dumpsters, cleaning, safety, and equipment shared across trades.
permits, testing and inspections, bonds, and insurance: depending on the contract.
your company's markup on the work.
We can carry general conditions as a line-item estimate based on the project duration, or leave them for you to complete if you prefer to price your own.
The same building can be estimated in different formats depending on who reads it:
the standard for bid estimates and subcontractor buyout. Each division lines up with how you'll send out bid packages.
useful for owners and designers comparing options, such as a steel versus wood frame, or two wall assemblies.
if your company has its own cost codes or bid form, we can work in it.
Offices, retail centers, restaurants, hotels, medical office buildings, and mixed-use projects. Commercial estimates often hinge on the MEP and envelope scope, and on whether the job is a core-and-shell or includes tenant fit-out. Commercial estimating →
Apartments, condominiums, townhomes, and student housing. Repetition helps (once a unit type is taken off, it scales) but corridors, amenity spaces, podium levels, and parking structures need separate attention.
New homes, additions, and custom builds for builders and owner-builders. Framing, roofing, and finishes carry most of the cost variation here. Framing estimating → Lumber takeoff →
Schools, healthcare facilities, churches, and public buildings. These usually come with detailed specifications, prevailing wage requirements, and heavier MEP and life-safety systems.
Remodels involve demolition, protection of existing work, and assumptions about hidden conditions. We list those assumptions clearly so the estimate holds up when walls are opened.
If your set is too large for email, share a Google Drive folder or plan room link.
Email the bid invitation and plans, or share a folder.
We review the set and reply with the fee and turnaround.
Questions about the site, schedule, or labor rates come early so the estimate reflects your conditions.
We aim to deliver with enough time for your review before bid day.
Add your sub and supplier quotes, and we'll update the totals if needed.
, so scope gaps between trades are caught in one review.
based on the project's zip code.
, so you know exactly what you're bidding.
instead of a full-time estimator's salary.
Most estimates are delivered in 24 to 48 hours, and single-trade takeoffs often within 24 hours.
More than 1,500 projects priced across federal, institutional, commercial and residential work, with every estimate checked by a second estimator.
A trade estimate prices one scope, like drywall or electrical. A building estimate prices every trade plus the general contractor's costs, and checks that nothing falls between them. GCs and developers usually need the full building; subcontractors usually need their trade.
It depends on building type, structure, finishes, MEP systems, and location. Square-foot figures can screen a project early, but two buildings of the same size can differ widely. A takeoff from your drawings is the only way to get a number you can bid.
Yes. For schematic or design development drawings, we'll prepare an early estimate with stated allowances for missing details. Preliminary estimating →
We can carry general conditions based on the project duration and apply your overhead and profit percentages, or leave those for you to complete. Tell us your preference when you send the job.
Yes. Because quantities are broken down by trade, you can compare sub bids against our numbers and spot scope that a sub left out.
Yes. Renovation estimates include demolition, protection, and stated assumptions about concealed conditions.
Send the drawings and your bid date. We'll review the set and send a fixed quote for the estimate.