Cost Planning
A cost plan sets target costs for each building element and checks the design against them at each stage. Budget estimating →
An estimate tells you what a project should cost before it starts. Quantity surveying keeps track of what it actually costs, from the first measured bill of quantities through every pay application, change order, and the final reconciliation.
Our quantity surveying services cover both sides: measuring and pricing the work before contract, and checking the money as it's spent. We work within U.S. contracting practice (schedules of values, pay applications, retainage, and change orders) so owners, developers, and contractors get independent cost control without translating from another system.
If you've worked with quantity surveyors overseas and want the same level of cost control here, that's the service this page describes.
The roles overlap, but the focus is different.
| Cost Estimator | Quantity Surveyor | |
|---|---|---|
| Main question | What will this cost to build? | Is the money being spent as it should be? |
| When | Before bidding or contract | From design through closeout |
| Typical client | Contractor or owner | Usually owner, developer, or lender; sometimes contractor |
| Output | Estimate or bid | Cost plans, bills of quantities, valuations, cost reports, final account |
Many projects need both. Our estimators handle the takeoffs and pricing; quantity surveying extends that work through construction. Construction cost estimating →
A cost plan sets target costs for each building element and checks the design against them at each stage. Budget estimating →
A bill of quantities lists every measured item of work with its quantity and unit, ready for contractors to price. When all bidders price the same bill, comparing bids becomes straightforward and pricing disputes later in the job are easier to settle.
We compare contractor or subcontractor bids line by line, identify missing scope and qualifications, and adjust them to a common basis so you're comparing equal scopes, not just bottom-line numbers.
Before the contract is signed, we check that the contractor's schedule of values is balanced: that early activities aren't overpriced to pull cash forward.
Each month we check the contractor's pay application against the schedule of values and progress on site, using photos, reports, or site visits, and confirm stored materials and retainage are calculated correctly.
We price each proposed change independently (quantities, rates, markups, and time impact) so you negotiate from a documented number. Estimating consultant →
Monthly reports show committed costs, approved and pending changes, contingency remaining, and the forecast final cost. Problems show up while there's still time to act.
At the end of the project, we reconcile the final contract sum: original contract, approved change orders, allowance adjustments, back-charges, and retainage release. You get a clear final account and a record of where the budget went, useful for the next project.
Quantities are only useful if everyone understands how they were measured. Is concrete measured net or with waste? Are openings deducted from wall areas? We state the measurement basis in every bill and takeoff so bidders, owners, and contractors are reading the same numbers.
who want independent cost control without a full in-house team
used to QS reporting on their projects
who need draw requests checked against work in place
who need detailed bills of quantities or valuation support on large jobs
whose clients ask for cost management during design
Pre-construction only, construction phase, or full lifecycle.
Single tasks (a BOQ or a bid evaluation) are quoted per task; ongoing services are scheduled monthly.
Drawings, specifications, contracts, schedules of values, and pay applications as the project progresses.
Each deliverable comes with clear backup so your team or lender can follow the numbers.
A quantity surveyor manages construction costs from design through completion: measuring work, preparing bills of quantities, evaluating bids, valuing completed work and changes, and reconciling the final cost.
The title is less common, but the work is the same as that done by cost consultants, cost managers, and owner's representatives. International owners and large projects increasingly ask for QS-style services.
If you only need a number to bid or budget, an estimator. If you need someone checking costs throughout construction (pay apps, change orders, forecasts) a quantity surveyor.
Yes: we compare it to the schedule of values and progress documentation and flag over-billing, stored-material issues, and retainage errors.
A document listing every measured item of work, with quantities and units, for contractors to price. It puts all bidders on the same scope.
Yes. Contractors use them for subcontractor bid packages and for pricing their own work.
Tell us where your project is and what kind of cost control you need. We'll propose the right scope and fee.