Los Angeles & Orange County
Infill multifamily, adaptive reuse, studio and creative office, and transit-oriented development on tight urban sites.
Estimates built for Title 24, seismic design and California's public works rules.
California asks more of a building than almost any other state. Seismic detailing adds steel and hardware, Title 24 sets the envelope and mechanical systems, wildfire zones dictate materials, and public work comes with some of the strictest wage and registration rules in the country. A number built on national averages misses most of that.
Prime Estimation prepares construction estimates and quantity takeoffs for California general contractors, subcontractors, developers and builders (from Los Angeles infill to Central Valley warehouses) with every requirement on the drawings carried into the line items and typical delivery in 24 to 48 hours.
California is several construction markets in one state. Labor rates in the Bay Area bear little resemblance to the Central Valley, and coastal permitting looks nothing like inland logistics work. We price each project to its own region.
Infill multifamily, adaptive reuse, studio and creative office, and transit-oriented development on tight urban sites.
Life-science and tech campuses, seismic retrofits, and housing on some of the most expensive labor in the country.
Biotech, defense and naval work, hospitality, and coastal residential with its own permitting requirements.
State government and institutional work, healthcare, and steady suburban residential growth in the surrounding counties.
Large-format warehouses and distribution centers along the I-10 and I-15 corridors, plus fast-growing residential tracts.
Agricultural processing, cold storage and industrial facilities from Fresno to Bakersfield, priced to inland labor markets.
The California-specific scope we look for on every set, so it lands in the estimate instead of a change order.
Shear walls, hold-downs, straps, anchor bolts, collectors and special moment frames add steel, hardware and labor that a lower-seismic estimate never carries. We take them off sheet by sheet from the structural drawings.
The California Energy Code drives insulation levels, glazing performance, mechanical efficiency and controls, and requires solar PV on most new low-rise homes. Those systems are priced as specified, not as generic equivalents.
In wildland-urban interface areas, Chapter 7A calls for ignition-resistant siding, ember-resistant vents, protected eaves and tempered glazing. We price the specified products rather than standard ones.
Bay Area and Los Angeles wages run well above inland markets, and union participation varies by trade and county. Labor is priced to the project's region and, on public work, to the DIR determination.
CALGreen sets mandatory green-building measures, including diversion of construction waste from landfill. Sorting, hauling and documentation are carried as general conditions instead of being missed.
Dense infill sites mean staging limits, street-use permits, restricted delivery hours and shoring next to existing buildings. We price the access the site actually allows.
California's requirements change more line items than any other state's. Here's how each one shows up in our work.
| Requirement | What it means | How we handle it |
|---|---|---|
| Building Standards Code: Title 24 | The California Building Code (Part 2), Energy Code (Part 6) and CALGreen (Part 11) apply statewide, with local amendments in many cities. | Takeoff follows the Title 24 parts and local amendments named on the drawings. |
| Prevailing wage: Labor Code | Public works pay prevailing wages set by the Department of Industrial Relations for each craft and county. | Labor priced to the current DIR determination for the project county. |
| DIR contractor registration: §1725.5 | Every contractor and subcontractor must be registered with DIR to bid on, be listed on, or perform public work. | Flagged in the assumptions so your sub list stays compliant. |
| Skilled and trained workforce | Some public and streamlined housing projects require a skilled-and-trained workforce, often with apprenticeship participation. | Labor mix and rates adjusted when the bid documents require it. |
| Contractor licensing: CSLB | Contractors need a Contractors State License Board license in the right classification for all but minor work. | Trade scopes split along CSLB classifications when you need sub packages. |
| Federal work: Davis-Bacon | Federally funded projects use U.S. Department of Labor wage determinations. | The applicable determination applied by county and trade. |
Full project estimates or a single trade: every one priced to the project's location and checked by a second estimator.
Complete estimates and quantity takeoffs for California projects.
One division measured in depth, in the units your trade bids in.
Everything happens from your digital drawings, so distance never slows the job down.
Upload the drawings, specs and addenda, and give us the project address or ZIP code and your bid date.
We review the set and reply (usually within a few hours) with a fixed fee and a delivery date. Nothing starts until you approve.
Quantities are measured digitally, priced to California material and labor conditions, and audited by a second estimator.
Excel and PDF with marked-up drawings and a written assumptions page, typically in 24 to 48 hours. Addenda are worked into the same file.
Yes. We price the insulation, glazing, mechanical equipment, controls and solar PV specified to meet the California Energy Code, along with CALGreen measures such as construction waste diversion.
From the structural drawings. Hold-downs, straps, anchor bolts, shear wall sheathing and nailing, collectors and moment frame connections are taken off as individual line items so nothing is buried in an allowance.
Yes. We price labor to the Department of Industrial Relations determination for the project county and note DIR registration and any skilled-and-trained workforce requirements in the assumptions.
Yes. When a project sits in a wildland-urban interface area, we price the Chapter 7A materials shown: ignition-resistant cladding, ember-resistant vents, protected eaves and tempered glazing.
Estimating is done from your drawings, so location doesn't limit the takeoff. What matters is pricing to California conditions (regional labor rates, Title 24 systems and local requirements) which is exactly what we adjust for on every California job.
Send your drawings and the project address. You'll get a fixed fee and a delivery date back, usually within a few hours.
We estimate projects in all 50 states. These are the areas with their own pages; see all service areas.