Wall height
taller walls take more labor and often need lifting equipment
Framing sets the pace of the whole job. Underbid it and your crews are working for free by the second floor. Overbid it and the GC gives the work to someone else. The material list is only half the number: the other half is how long it takes your crew to stand it up.
Our framing estimating services price complete framing packages (material, labor, and equipment) for wood and light-gauge steel, from single-family homes to multifamily buildings.
Materials
Labor
Equipment
Framers price labor in different ways: per square foot of floor area, per piece, per assembly, or by crew-days. Whatever method you use, the same factors drive the hours:
taller walls take more labor and often need lifting equipment
angled walls, vaulted ceilings, and complex rooflines slow production
more windows and doors mean more headers, kings, and jacks
tight nailing schedules and hardware add labor quickly
upper floors move slower than the ground floor
tight sites and limited staging space reduce productivity
We price labor by assembly using production rates adjusted for these factors, or apply your own rates if you provide them.
The lateral system is easy to underprice. Shear walls may require thicker sheathing, closer nail spacing, blocking at panel edges, and hold-downs at each end. Multiply that across a multifamily building and the hardware and nailing labor become a significant line.
We take off shear wall lengths and types from the structural drawings and count hold-downs, straps, and connectors from the schedules: material and installation.
Platform framing for homes, townhomes, and multifamily; heavy timber and glulam elements; floor systems with I-joists or open-web trusses; and roof framing with trusses or stick framing.
Load-bearing cold-formed steel walls, joists, and trusses; exterior curtain wall backup framing; and steel-framed roof systems. Light-gauge labor differs from wood: screws instead of nails, different connection details, and often engineered submittals. Metal estimating →
Non-structural interior studs are typically part of the drywall scope. Drywall estimating →
Wood-framed multifamily brings its own estimating issues:
where wood framing sits on a concrete or steel podium
rated walls, floors, and corridors need specific framing details
continuous rod hold-down systems and compression gaps in mid-rise wood buildings
unit types repeat, so takeoffs scale, but corridors, stairs, and amenity areas don't
Panelized or prefabricated wall panels shift labor from the site to the factory and add crane time. If you're comparing stick framing with panels, we can price both approaches side by side.
Upload the drawings through our quote form, share a Google Drive or plan-room link, or email them. Large sets travel best as a shared folder.
Upload Your Plans →Or email info@primeestimation.com.
It varies with design complexity, building height, lateral requirements, material prices, and local labor rates. Square-foot numbers are useful for comparison, but bids should come from a takeoff. Single-trade takeoffs typically run $250 to $600.
Yes, if you're bidding labor only and the material is supplied by others.
A lumber takeoff lists materials. A framing estimate adds labor, hardware installation, and equipment to give a full bid price.
Yes: both load-bearing and curtain-wall backup framing.
We can include trusses priced from the truss layout, or note them as supplied by others.
Send your plans and tell us your scope. We'll quote the estimate and delivery date.